WK8 Case Study-02

The exhibition will be held in the centre of the open square, which will be assembled with pre-customized boards in the factory. The use of pre-processed plates can reduce on-site operations and improve the efficiency of on-site stage construction. At the same time, standardized size and material can save cost, convenient and fast. Around the business centre, there will be a large number of shopping and dining passengers after the lunch break and after work. After the completion of the exhibition, some people will be attracted to participate in the activities, which can attract more people to gather in the centre of the exhibition. This exhibition attracts visitors in a similar way to the original market concept, with free performance activities as the core to attract the audience’s onlooking and interaction.

The building materials of this exhibition are standardized, which can not only be assembled quickly but also be combined into different forms. In this way, when the next exhibition is held, it can bring people different experiences and save costs. We used this idea for reference in the design of the project. We hope that the exhibition can be easily installed and carried so that it can be flexibly adapted to different venues.

发布者:iseeeverywhere

I'm a interior architect designer. I'm full of pasion and love for design to create a better life.

留下评论

通过 WordPress.com 设计一个这样的站点
从这里开始